- Details
- Hits: 10017
Our dedicated team, which combines experience and youth, has participated in projects in Belgium, the Caribbean and South America:
Horacio Oduber Hospital - Aruba
Solid Energy Solutions cooperates with engineering and installation firms giving them technical support and consultancy
Newtech N.V. (Suriname):
McDonald's, Nederlandse Ambassade (Suriname), Hermitage Mall, TBL cinemas, Princess Casino, Rode Kruis Bloedbank, MRI, Integra Marine, Royal Torarica, King's Noord, Popeye’s, Nationaal Archief Suriname, BOG hospital.
Staatsolie, Fernandes Ice Cream, Telesur Transmission
CHS (Aruba):
Kooyman Megastore, SETAR, Radisson Hotel, Centro Medico Aruba
CHS (Curacao):
Orco Bank
- Details
Westmalle Abbey - Belgium
Delivery, installation and programming of HVAC - control cabinets for farm, cheese factory, church and guesthouse with Siemens Synco 700 controllers.
Through a webserver the installation is monitored.
- Details
Horacio Oduber Hospital - Aruba
Delivery, installation, programming of;
Control cabinet for air handler units, VAV boxes, Domestic hot water, boiler room, pump room with Siemens Desigo controllers.
Installation of Siemens Desigo CC building management system (BMS), integrating signals from HVAC negative pressure rooms, gas alarm devices, equipment in pump room and status of transformers and generators.
Supply of various equipment and materials
Balancing vessels, electrical components, heat exchangers modules for domestic hot water, balancing valves.
- Details
Fernandes Ice Cream – Suriname
Fernandes Ice Cream is one of the biggest companies in the food industry from Suriname.
Energy Analysis
Solid Energy Solutions had a request for reducing the energy consumption in the factory.
Major energy loads were spotted and recommendations for a better performance were made.
Change of the control sequence of the screw compressors and heat recuperation.
For the boiler plant the following advises were made; installation of timer, water preheating, shifting of the heating period to the hours with lower cost of electricity.
The cold room showed high infiltration rate resulting in ice built up on the evaporators. Measures to reduce this infiltration; horizontal flow air curtain for anteroom, modification of the loading process, increasing the efficiency of the defrost cycle by installing defrost flaps and temperature sensor to optimize the end time of the cycle
Equipment and material supplier
Ammonia leak detection devices, frequency drives for production machines, piping materials, replacement parts for air handlers.